By applying GD pits the local shuttering and concreting of the pit construction of dock levellers cease to exist. Since the GD-pit is going to be assembled at the site from pre-fabricated ferro-concrete modules. Simultaneously an extraordinarily time consuming “do not like” job containing many error sources disappears.
GD Pits Made of Pre-assembled Elements (even for trucks with tail-lift):
- Execution time decreases radically - The pit can be fit into the construction planes as one unit - Pre-fabricated components with high size accuracy - Permanent, guaranteed quality - Only the assembly concrete shall be provided by the customer - After assembly the pit can immediately be burdened - Suitable to receive dock levellers of any size and structure - The dock leveller can be installed even in the end of the building work, thus avoiding damage
Monolith Made at the Site (for trucks with tail-lift too):
- the shutter is easy to make, the accurate size is provided by the assembly frame - quick assembly, after lifting it in the equipment must be fixed with intermittent seam, the seam gaps shall be filled with sealing material - after fixing and commissioning the dock leveller can immediately be used - the assembly frame can be surrounded by a big high carrying capacity concrete area, which reduces the danger of crazing and jagging (vacuum hollowed concrete-stone, plastic floor cover) - it is possible to install a dock leveller after having finished all construction work
Further information, size index can be found in our installation guide.